Tenders and Contract Events are published by the NWT & Nunavut Construction Association. While we make every effort to ensure the accuracy of the information contained herein, NNCA is not responsible for its accuracy, reliability, completeness, or timeliness, and as such, readers should confirm all relevant information with the appropriate contract authorities.
UPDATED: Building Condition Assessment at Yukon University
Closing Date: June 6
CLOSED: Consulting Services – Hidden Valley Storm Pond Outfall
Closing Date: May 24
NEW: Interior Painting at Robert Service School
Closing Date: June 9
NEW: Auxiliary Program Addition at Selkirk Elementary School
Closing Date: June 14
UPDATED: Consultant Services for Building Development
Closing Date: June 1
UPDATED: Re-Roofing two YH Units, Whitehorse, YT
Closing Date: May 31
UPDATED: Demolition, 111 Pyrite, Ross River, YT
Closing Date: June 2
CLOSED: Asbestos Abatement at Takhini GOCB
Closing Date: May 23
CLOSED: Elevator Modernization Project – YHC
Closing Date: May 20
CLOSED: Design Build, 20 Laurier Ave. Mayo, YT
Closing Date: May 19
CLOSED: Design Build, Faro Duplex
Closing Date: May 19
CLOSED: Flooring Replacement – Yukon Archives
Closing Date: May 19
Highway Construction, km 1419.6 to km 1422.1, Alaska Highway #1
Closing Date: June 9
Ross River School – Lighting Fixture Replacement
Closing Date: June 8
CLOSED: Demolition, 108 Prospector Rd. Carmacks, YT
Closing Date: May 18
CLOSED: Parking Lot Improvement at Main Administration Building
Closing Date: May 18
UPDATED: Glycol Loop, 600 College Dr. Whitehorse, YT
Closing Date: June 2
Mayo Water Treatment Plant Geoexchange Test Well Drilling
Closing Date: June 16
Copper Haul Road Rehabilitation – Engineering Services
Closing Date: June 13
Notice of Intent May 2022
Closing Date: August 31
Compost Processing Facility Spray Foam Insulation Upgrade
Closing Date: June 8
UPDATED: Consultant Services for New Morgue Design
Closing Date: May 31
Replacement, Air handling unit, Old Crow
Closing Date: June 7
UPDATED: Water Plant Tank Cleaning
Closing Date: May 25
CLOSED: Siding Replacement, 4046 4th Ave. Whitehorse, YT
Closing Date: May 12
UPDATED: Ross River School New Mechanical Room
Closing Date: May 25
Infrastructure Survey of Various Yukon Airports and Aerodromes
Closing Date: June 6
Sealed Units Replacements, Watson Lake, YT
Closing Date: June 2
RFI for the SSDBT
Closing Date: June 30
CLOSED: RFSA Appraisal Services
Closing Date: May 9
CLOSED: 2022 Asphalt Overlay Project
Closing Date: May 9
CLOSED: 2022 Rural Roads Surfacing
Closing Date: May 9
Domestic Water Tank Cleaning, YHC Units, Carcross, YT
Closing Date: June 1
Domestic water tank cleaning, YHC Units, Teslin, YT
Closing Date: June 1
Domestic water tank cleaning, YHC Units, Ross River, YT
Closing Date: June 1
Domestic Water Tank Cleaning, Old Crow, YT
Closing Date: May 31
Dempster Pit Upgrades
Closing Date: May 26
City of Whitehorse Adaptive Management Plan
Closing Date: May 31
General Construction SOA
Closing Date: May 26
UPDATED: Ross River School Relevelling System Installation
Closing Date: May 26
CLOSED: F.H. Collins Trade Education Wing Reroofing
Closing Date: May 5
CLOSED: Oil Water Separator Fraser Camp Grader Station
Closing Date: May 5
CLOSED: HVAC Upgrades at Supply Services and Stores Warehouses
Closing Date: May 5
CLOSED: Furnace Replacements, Various Units, Carmacks, YT
Closing Date: May 5
Ogilvie Grader Station Solar Energy System Integration Project
Closing Date: June 14
CLOSED: Fuel Control Improvements
Closing Date: May 3
Captain Martin House Roof Replacement
Closing Date: May 30
In Water Vessel Cleaning
Closing Date: November 1
CLOSED: Exterior Upgrades, 6 Thompson Rd. Whitehorse, YT
Closing Date: April 28
CLOSED: Interior Retrofit 205A 8th Ave. Watson Lake, YT
Closing Date: April 28
CLOSED: Tank Farm Master Plan
Closing Date: April 25
CLOSED: Yukon University Electric Thermal Storage Unit Installation
Closing Date: April 25
DISO – Geotechnical Engineering SOA
Closing Date: June 6
Structural Engineering Services, Request for Standing Offer
Closing Date: June 6
CLOSED: Production and Stockpiling of 20mm Crushed Gravel
Closing Date: April 18
CLOSED: Supply of Crushed Sand
Closing Date: April 18
CLOSED: Replacement of Lapie River #2, km 209.8, South Canol Road #6
Closing Date: April 14
CLOSED: Lewes River Boat Lock EPC
Closing Date: April 12
Roadway Paving Equipment
Closing Date: June 1
CLOSED: Interior Retrofit 18-35 Lewes Blvd, Whitehorse, YT
Closing Date: April 7
CLOSED: Millwork Replacement at Sarah Steele Building
Closing Date: April 7
CLOSED: Yukon Wide Airfield Electrical Assessments
Closing Date: April 7
Geotechnical Support Services
Closing Date: April 26
In Water Vessel Cleaning Request
Closing Date: October 26, 2022